JKR Terengganu engaged Geotechnica Sdn Bhd to conduct a Slope Hazard and Risk Assessment for the proposed Pusat Ummah development at Kg. Baru, Pulau Redang — determining landslide failure likelihood, risk to surrounding assets, and mitigation recommendations ahead of development.
CLIENT
YEAR
JKR Terengganu / GoGEO Engineering
2022
Slope hazard and risk assessment for the proposed Pusat Ummah development at Kg. Baru, Pulau Redang, Terengganu.
Coastal, topographically and geomorphologically variable terrain, requiring hazard and risk modelling appropriate to the island's specific conditions.
Terrain information was needed to formulate a hazard and risk model, validated against actual site conditions before any development plan implementation.
Aerial Photogrammetry
Used to obtain terrain information forming the basis of the hazard and risk model.
Hazard & Risk Modelling
Formulated the likelihood of landslide failure and the consequence/risk to surrounding assets and facilities.
Field Data Collection
Carried out to confirm assigned risk ratings reflected actual site conditions.
Multiple locations across the site were rated Very High risk for landslide failure.
Field-validated risk ratings accurately reflected the actual conditions observed on site.
A conceptual design for mitigation measures appropriate to the site's topographical and geomorphological conditions was proposed for all Very High-risk locations, informing JKR Terengganu's development plan ahead of implementation.
Navigation Panel
Contact Us
Geotechnica Sdn Bhd
Wisma ESO,
No. 3-2,
Jalan Suria Puchong 4,
Puchong Gateway Square,
Pusat Perniagaan Suria Puchong,
47110 Puchong, Selangor.
Tel: 03-5569 7765
Email: admin@geotechnica.com.my
All rights reserved. Copyright © 2026 Geotechnica Sdn Bhd (1378487-P)