Home » Services » Detailed Geological Assessment at KP220

Detailed Geological Assessment at KP220 of SSGP — Pipeline Geohazard Investigation

geological assessment geotechnica

Detailed Geological Assessment at KP220 of SSGP

In November 2021, a pipeline dig-up activity revealed a pipeline parting at KP220 of the Sabah–Sarawak Gas Pipeline (SSGP) right-of-way, suspected to be caused by geohazard. Geotechnica Sdn Bhd, in association with Wan Husin & Associates Sdn Bhd, was appointed to perform a geological assessment and recommend mitigation action for PETRONAS Carigali Sdn Bhd and WHA Sdn Bhd.

CLIENT

YEAR

PETRONAS Carigali Sdn Bhd / WHA Sdn Bhd

2022

Project Overview

Scope, conditions & requirements

Project Scope

Geological assessment of a pipeline parting incident at KP220 along the SSGP right-of-way, to determine the cause and recommend mitigation action.

Site Conditions

Field assessment showed high deformation and active slope movement, with signs of distress including faults, buckling, boudinage, tension cracks and water seepage.

Investigation Requirements

Kinematic analysis and XRD testing were required to identify the failure mechanism and characterise the extent of weathering and deformation at the site.

Our Approach

How the incident was assessed

Field Assessment

Site inspection identifying geological structures and distress indicators — fault, buckling, boudinage, tension cracks and water seepage — along the affected corridor.

Kinematic Analysis

Assessed potential failure modes at the site, identifying sliding, wedge and toppling failure as credible mechanisms.

XRD Testing

Mineralogical testing of site material to characterise the extent of weathering and deformation.

Key Findings

What the assessment showed

Finding 1

Kinematic analysis and XRD testing identified potential sliding, wedge and toppling failure mechanisms at the site.

Finding 2

Testing revealed intense weathering and deformation consistent with the active ground movement observed in the field.

Project Outcomes

How the findings are used

Immediate and permanent remedial works were recommended to prevent further deterioration at KP220 — giving PETRONAS Carigali and WHA Sdn Bhd a clear mitigation pathway to restore and protect pipeline integrity following the parting incident.

Related Services

Methods used on this project

Discuss a Similar Project