Confirm the ground can carry what you build.
Outcome / Problem
What It Helps Determine
Definition / Methodology
Core Concepts
Technical components
Applications
Where This Service Is Used
01
Soil Sampling
- Borehole Drilling
- Logging of Soil Strata
- Disturbed & Undisturbed Sample Collection
02
In-Situ Testing
- Cone Penetration Test (CPT)
- Standard Penetration Test (SPT)
- Vane Shear & Field Density Tests
03
Soil Classification
- Visual & Tactile Soil Inspection
- USCS or AASHTO Soil Group
- Laboratory Classification
04
Laboratory Testing
- Compaction & CBR Tests
- Moisture Content & Unit Weight
- Shear Strength, Consolidation & Permeability Tests
05
Groundwater Analysis
- Water Table Monitoring
- Piezometer Installation
- Seasonal Groundwater Fluctuation Analysis
06
Settlement Estimation
- Load-Settlement Curve Generation
- Prediction of Long-Term Settlement
- Primary & Secondary Consolidation Analysis
Process
How the Assessment Is Carried Out
01
Desktop Study & Site Reconnaissance
02
Field Drilling & In-Situ Testing
03
Laboratory Testing
04
Reporting & Recommendations
Equipment
What We Use in the Field
Outputs / Deliverables
What You Receive
- Borehole / soil strata log
- SPT & CPT test results
- Groundwater level data
- Laboratory test results
- Geotechnical report & foundation recommendations
Malaysian Context
Why This Matters Here
LOCAL CONDITION
IMPLICATION
Integration / Related Services
Often Paired With
Slope Hazard Assessment
Electrical Resistivity
Geological Map Assessment
Case Study
From the Field
Engineering Geological Mapping at Politeknik Mersing
CHALLENGE
APPROACH
FINDING
OUTCOME
Standards / Compliance
Done to Standard. Signed Off Professionally.
BS 5930 and Malaysian Standards
Code of Practice for Ground Investigations
Authorized by
Signed off by a registered professional
P.Geol Gs. Hairil Azwan
P.Geol · Registered Geologist, Board of Geologists Malaysia
Proof Points
Why Geotechnica for Soil Investigation
01
High-End Equipment
02
National-Level Project Experience
03
Certified Engineers & Surveyors
04
Custom Report & GIS Integration
FAQ
Frequently Asked Questions
Soil investigation is the process of studying ground conditions before construction to ensure safety and stability.
Malaysia’s soft soils, rainfall, and mixed geology make soil studies essential for safe foundation design.
It includes borehole drilling, in-situ tests (like SPT), lab testing, and geotechnical reporting.
A borehole test drills into the ground to collect soil samples and measure depth to rock or water.
SPT is a field test to measure soil strength by driving a split spoon sampler into the ground.
Typical depths range from 3 to 30 meters, depending on the building load and soil type.
A standard soil study may take 2–5 days on-site, plus several days for lab work and reporting.
It’s not recommended. Without soil data, there’s a risk of settlement, cracks, or failure.
It includes soil layers, test results, groundwater info, and foundation design recommendations.
We offer accurate, reliable soil studies using certified methods and expert geotechnical engineers.
Gallery
Project Photography